  • The Newark Energy Center, a 655 MW natural gas-fired combined cycle power plant, will provide more efficient, flexible and reliable power to almost 700,000 homes.
  • Armistead installed piping for two GE 7F.05 gas turbines and one GE D400 steam turbine.