Low Pressure Boiler Blowdown Replacement

Buchanan, NY

CLIENT/OWNER

Entergy

SCOPE OF WORK

Process Piping

BUILDING TYPE

Nuclear Power Plant

  • Armistead Mechanical replaced approximately 500 feet of low pressure boiler blowdown line with the added challenge of working in a tunnel.
  • All safety and security requirements for working in a nuclear plant were met.