CLIENT/OWNER
Entergy
SCOPE OF WORK
Process Piping
BUILDING TYPE
Nuclear Power Plant
- Armistead Mechanical replaced approximately 500 feet of low pressure boiler blowdown line with the added challenge of working in a tunnel.
- All safety and security requirements for working in a nuclear plant were met.